QUALITY SYSTEM
Use the equipment inventory and inspection route to connect drawing requirements with machining centres, turning, CMM reporting, and controlled handoffs.
EQUIPMENT INVENTORY
Machining centres
Document machining centre categories, working envelope, spindle and workholding constraints, program ownership, and approved capacity before release.
PROCESS ROUTE
Turning + secondary operations
Define turning, live-tool work, deburring, finishing, and outside-process handoffs with ownership, revision control, and traceability.
QUALITY CONTROL
CMM + inspection workflow
Plan first article, in-process checks, CMM reporting, final inspection, traceability, and nonconformance handling before production begins.
Bring the drawing, material, quantity, and critical constraint.
Start an RFQ